| Visit India | Sitemap | Mail us | Know us | What's new | Cartoon |
| Fashion | Recipes | Astrology | Birthday Bumps | News |  Web Radio | Know past |
| Art, Culture & Religion | Educational Institutions | City - Codes |  S.T.D. Codes | Jokes | World Time |

Progress of the Gondal State in different fields during 1884 - 1932 A.D.
Administration of Land
Arboriculture
Irrigation
Famine Relief
Village Development
Protection & Reclamation
Trade & Industry
Electrification
Railway
Public Work
Roads
Medical Relief
Protection & Judicial
Municipalities
Town Planning
Water Works
Education & Schools
Progress - Main Page


 

 


Electrification

     The electrification scheme as Gondal dates back to 1924. Its began with 200 h. p. as its generating capacity. In about 5 years, the load, particularly the industrial load, has developed to such an extent that to cope with it, three more engines had to be ordered. The present total capacity as completed is 1300 h. p. To accommodate these units the power house had to be extended.

     The supply is distributed by underground cables throughout the whole system, not an inch being overhead.


Electric Power House
Gondal

Electrical 
Supply

     The town of Upleta is provided with similar electrification. The population of Upleta is only 13,000 and it is very rare in India to find a town with such a population to have such electrical amenity.

     A similar scheme for Dhoraji is taken in hand.

     Villages in the vicinity of these towns will have electrical facilities in a short time.

     The total cost of these schemes will be about Rs. 25,00,000.


Upleta Power House


Upleta Generating Station
      1,000 B.H.P.